Home/Fabrication

04 //AWS D1.1Custom FabStainless

Custom Fabrication.

From print to finished steel. Brackets, guards, platforms, and one-off assemblies — cut, fit, and welded in carbon, stainless, and aluminum, and installed inside your shutdown window.

Fabricator shaping a steel plate in the shop, shower of sparks ±1/16” Dimensional Tolerance

What This Service Covers

Built From Your Print.

Plant maintenance supervisors need custom brackets, guards, platforms, and structural repairs that don’t exist in any catalog. We build from engineer-stamped drawings or your hand sketches — cutting, fitting, and welding custom assemblies in carbon steel, stainless, and aluminum.

Tolerances hold to ±1/16” on critical dimensions, and every fabrication gets dimensional sign-off before it leaves the shop. For shutdown work, we pre-fabricate, stage, and mark every piece — so installation is bolt-up, not build-up.

Precision MIG weld on a fabricated steel assembly
22 framesFabricated in 1 Week
±1/16”Dimensional Tolerance
4-dayShutdown Window Met

What’s Included

Shop Work, Site Ready.

Brackets & Supports

Equipment stands, pipe supports, and machinery bases jig-built square and true.

Guards & Enclosures

Machine guarding, screen panels, and safety enclosures that satisfy your EHS walkdown.

Platforms & Access

Stairs, ladders, mezzanine infill, and service platforms with correct nosings and rails.

Stainless & Aluminum

Food-grade stainless frames and lightweight aluminum assemblies with proper filler and finish.

Shutdown Packages

Pre-fabricated, staged, and marked kits installed inside your outage window — with walkdown time to spare.

Sign-Off Documentation

Dimensional reports, material certs, and weld records packaged for your project file.

Process

Sketch to Steel.

01

Review & Quote

Drawings or sketches in, questions back fast, and a fixed quote with material, finish, and date.

02

Cut & Fit

Plasma and saw cutting, jigged fit-up, and tack inspection before any production weld.

03

Weld & Finish

Production welding to procedure, grinding to your finish spec, primer or galvanize-ready prep.

04

Verify & Install

Dimensional sign-off in the shop, staged delivery, and installation inside the agreed window.

Project: 22 equipment support frames, packaging plant — delivered and installed in a 4-day shutdown.

Shop Gallery

Recent Fab Work.

Plate being shaped for a custom frame assembly
Frame plate work
Precision weld pass on a fabricated assembly
Precision assembly weld
Finished stainless skid with gauges, ready for delivery
Finished stainless skid

Questions

Fabrication FAQs.

Can you build from a sketch or just formal drawings?

Both. Engineer-stamped drawings are ideal for structural work, but most brackets, guards, and supports start as a hand sketch or a site measurement — we turn it into a dimensioned shop drawing for your approval first.

What tolerances do you hold?

±1/16” on critical dimensions as standard, tighter on machined interfaces. Every job ships with a dimensional report.

Do you install, or shop-build only?

Both. Shutdown packages include staged delivery and installation inside your outage window, coordinated with your maintenance lead.

Which materials and finishes?

Carbon steel, 304/316 stainless, and aluminum — finished as-welded, ground smooth, primed, or prepped for galvanizing to your spec.

Need it built? Send the print.

Drawings, sketches, or just dimensions and a deadline. We’ll quote it fixed and hit your window.

Request Capability Review